
Scope of Work (SOW)
Phase 1: Pre-Implementation & Discovery
Architecture Review / site survey: Review the existing Low-Level Design (LLD) and High-Level Design (HLD) documentation.
Site Readiness Assessment: Verify physical rack space, power allocation, cooling availability, and structured cabling compliance.
Phase 3: Deployment & Physical Implementation
Hardware Rack & Stack: Mount Rf device for P2P & P2MP connectivity on 3M pole / mast, Mount routers, switches, firewalls, and Wireless Access Points (WAPs) into standard server racks.
Physical Patches: Execute structural fibre and copper patch cabling according to the logical port matrix map.
OS & Firmware Maintenance: Upgrade all network operating systems to the manufacturer-approved, stable gold standard release.
Phase 2: Configuration & Staging
Base Configuration: Build configuration files including device hostnames, management IPs
Core Network Logic:
Provision VLANs, Inter-VLAN routing, and trunking protocols.
Configure routing protocols ([e.g., OSPF, BGP, or EIGRP]) and Spanning Tree Protocol (STP) parameters
Phase 4: Testing, Migration, & Handover
Validation Testing: Execute throughput, failover, link aggregation, and latency testing to ensure network resilience.
User Migration: Perform data and user cutover traffic routes during designated maintenance windows.
As-Built Documentation: Update topology diagrams , IP address management (IPAM) records, and port mapping tables