Sion Engineers

Back
Employer Logo
Sion Engineers
Partnership Firm
177/3D1, Tiruppur Road, Kottamangalam, Udumalpet.
Tiruppur - 642201

No. of Branches : 0 | Total No. of Staffs : < 50

About Employer

Company Profile

Sion Engineers which was established in 2011 by Mr. Povas Rajapandi , who has professionally qualified with rich 30 years of experience in wind industry particularly in O & M area, Projects and gearbox services.

Sion Engineers is one of the leader in wind turbine projects Tower assembly & Erection activities.We have handled various capacities SEPC 250KW x 15 Machines (50 Mt Hub Height), Gamesa 850KW x 45 Machines at Dharapuram and Poolavadi site in 2011, Gamesa 850Kw x 17 Machines (65 Mt hub height) at Buregula site in Andrapradesh in 2013, Gamesa G97 2MW x 60 Machines at Lokapoor, Batkurke, Gurumatakal, Sattagiri site in Karnataka.

Sion Engineers is one of the leading windmill gearbox service provider of various makes of Gear Boxes like Flender, Hansan, Metso,Winergy ,JK ,Kirloskar & Elecon with various capacities of wind turbines NEPC 225 & 400 KW, RRB 250 & 600Kw, CWEL 250kw, Pioneer wincon 250 & 750 KW and NEG Micon 750KW. We have recently upgradaded in technical as well as we have established a new factory set up where we can do service for up to 2 MW. We are also providing onsite breakdown rectification like Gear box high speed and intermediate bearing replaced with required precision tools. We also provide gear pump services with OE spares at the site. We provide hydraulic cylinders seal replacement and bore reconditioning for high capacity wind turbine generators.We also do replacement and reconditioning of slew bearing and blade pitch bearing.

Sion Engineers is having vast experience with efficient team to install the over head lines upto 33KV single circuit as well as double circuit lines. We have installed nearly 60KM lines for various customers at Panagudi, Kayathar and Uthumalai sites in Tamilnadu.

Sion Engineers is providing technical team for installing of solar projects. We have installed 66 MW at Kabhalli, Kogali in Karnataka in 2018 Project and 100 MW solar project at Kayathar Site in Tamilnadu.

Currently we have been deploying 2 teams, 2MW Gamesa WTG installation activities at Fategarh site in Rajasthan.

Sion Engineers is having full fledged work shop facility for doing gearbox services with an area of 4000 sq ft building with 15 Ton Electric Hoist (EOT Crane), Hydraulic Press 250 Ton capacity 2 No’s, Lathe up to 14 Feet length with 24 inch centre height, Radial drilling machines, Gas, Arc, Mig welding facilities, Electric torque power tool up to 500N-M, Hi torque 9500 N-M